Cold Store Dry and Pre-action Sprinklers
Pre-action sprinklers for the freezer rooms and a dry pipe system for the chilled loading area of a food distribution facility, with pipework supervised by a nitrogen generator.
Since 2009 · Istanbul, Türkiye
From the pump room to the sprinkler grid, from clean-agent suppression to the detection panel, we take your facility from design to periodic maintenance under one contract.
Services
A warehouse and a server room do not share the same fire risk. We assess each area on site and recommend the suppression or detection system that fits the code and the way the space is used.
How we work
The team that designs the system also installs it, commissions it and maintains it for years. Responsibility stays in one place.
Request a free survey01 · 1–3 days
We walk the facility, record the condition of existing systems, the water supply and the high-risk areas.
02 · 1–3 weeks
Hydraulic calculations, equipment selection and drawings are prepared to local regulations and the relevant standards.
03 · Per project
Pipework, pump rooms, valve stations and control panels are installed by our own crews.
04 · Before handover
Pressure tests, flow tests and scenario trials are documented and handed over with signed reports.
05 · Annual contract
Scheduled inspections, breakdown response and maintenance records kept ready for audits.
About us
Since 2009 we have been installing fire protection systems for factories, warehouses, hotels, hospitals and commercial buildings in and around Istanbul.
Our engineers and our site crews work as one team, so what is promised at the survey is what gets installed at handover.
Projects
Pre-action sprinklers for the freezer rooms and a dry pipe system for the chilled loading area of a food distribution facility, with pipework supervised by a nitrogen generator.
Ceiling and in-rack sprinklers for a high-bay distribution warehouse, with a pump room housing electric, diesel and jockey pumps. Pipework was left ready for extension, since the racking layout is expected to change during operation.
A server hall, UPS room and electrical room inside an office building were protected by an inert gas system fed from a shared cylinder room through selector valves. Enclosure integrity was verified by door fan testing.
References
Client feedback
Since we started working with Esfa Yangın, maintenance and service have run without a single hitch.
We've worked together for many years. Whatever we need, they help.
They respond to issues immediately and focus on solving them. I recommend them without hesitation.
Their response time on faults, and the way they explain the work, are excellent.
Knowledge base
We inspect the existing installation on site, report gaps and compliance risks, and prepare an itemised proposal. The survey is free of charge.